Project Information

Project Title M4 Junction 32 MOVA
Route No. M4
Grid Ref: 314041, 181520
Programme Type Lighting Comms and Signals
Project stage Construction
Designer Neath Port Talbot
Project Description

Over the years problems have been encountered with excessive queues on the M4 Jct 32 Coryton Interchange. Following assessment of the traffic flows and the extent of the queuing at the entries to the gyratory and on the gyratory itself. It has become apparent that the gyratory would benefit from the provision of a MOVA (Microprocessor Optimised Vehicle Actuation) signalization system, to manage the flow of vehicles through the junction by optimising queuing lengths on all the approaches.

The South Wales Trunk Road Agency’s Framework Contractor, Cemex undertook the construction of the scheme and works commenced in March 2007. The works were completed in August 2007.

Aim of Project / Benefits

The aim of the project is to reduce the amount of queuing occurring on the system. It is anticipated that the benefits to the local residents will be a reduced level of traffic noise produced by the queuing traffic, reduction in pollution levels, the reduction in delays to the flows of the traffic using the network.


Start Date Duration Completion Date
March 2007 5 Months August 2007
Total Project Value (£) 500,000
Pre / During Construction Photographs Post Construction Photographs