| Scheme Programmed on Site |
|
|||||
| Location | Usk Bridge | |||||
| Scheme Name | A465 Usk Bridge Grouting of Tendons | |||||
| Scheme Type | Bridge Renewals | |||||
| Scheme Description | Construction of a second test panel, carryout a trial of a regrouting system, and provide regrouting of the tendons works in line with the results of the trial panel on the actual structure. | |||||
| Grid Co-ordinates | ||||||
| Service Provider | Giffords | |||||
| Contractor | Alun Griffiths |
|||||